General Contractor: KBS, Inc.
Assisted the design team in value engineering a more cost effective deep foundation system. This system consisted of approximately (220) 18" diameter auger cast piles with varying lengths and bearing on bedrock. Piles were designed for working loads of 180 kips in compression and 17 kips in lateral.