Dominator Roller Coaster

Greenville, NC

General Contractor:

Test Working on a fast track project for the construction of a new roller coaster, Technical Foundations put two fully operational auger cast piling rigs and supporting equipment on the job to meet the project schedule. A total of 729 auger cast piles were installed; the piles were 16” diameter, 40’ deep.